pivot_forecast/readme.md

30 lines
2.0 KiB
Markdown
Raw Normal View History

2020-10-23 00:19:39 -04:00
## worked on so far
setup
----------------------------------------------------------------------------------------------------------------------------------------------------
the basic assumption is a single sales table is available to work with that has a lot of related data that came from master data tables originally.
the goal then is to break that back apart to whatever degree is necessary.
2020-10-27 23:12:10 -04:00
* _**run**_ `schema.sql` and `perd.sql` to setup basic tables
2020-10-27 23:47:21 -04:00
* create a table fc.live as copied from target (will need to have columns `version` and `iter` added if not existing)
2020-10-22 23:36:45 -04:00
* _**run**_ `target_info.sql` to populate the `fc.target_meta` table that holds all the columns and their roles
* fill in flags on table `fc.target_meta` to show how the data is related
2020-10-22 23:36:45 -04:00
* _**run**_ `build_master_tables.sql` to generate foreign key based master data
2020-10-23 00:19:39 -04:00
routes
2020-10-23 00:19:39 -04:00
----------------------------------------------------------------------------------------------------------------------------------------------------
* all routes would be tied to an underlying sql that builds the incremental rows
* that piece of sql will have to be build based on the particular sales layout
* **columns:** a function to build the columns for each route
* **where** a function to build the where clause will be required for each route
* the result of above will get piped into a master function that build the final sql
* the master function will need to be called to build the sql statements into files of the project
route baseline
----------------------------------------------------------------------------------------------------------------------------------------------------
* forecast = baseline (copied verbatim from actuals and increment the dates) + diffs. if orders are canceled this will show up as differ to baseline
* regular updates to baseline may be required to keep up with canceled/altered orders
* copy some period of actual sales and increment all the dates to serve as a baseline forecast