## worked on so far setup ---------------------------------------------------------------------------------------------------------------------------------------------------- the basic assumption is a single sales table is available to work with that has a lot of related data that came from master data tables originally. the goal then is to break that back apart to whatever degree is necessary. * _**run**_ `schema.sql` and `perd.sql` to setup basic tables * create a table fc.live as copied from target (will need to have columns `version` and `iter` added if not existing) * _**run**_ `target_info.sql` to populate the `fc.target_meta` table that holds all the columns and their roles * fill in flags on table `fc.target_meta` to show how the data is related * _**run**_ `build_master_tables.sql` to generate foreign key based master data baseline ---------------------------------------------------------------------------------------------------------------------------------------------------- * copy history and increment by year to form a baseline * need to be able to handle order/ship dates generically * need to build the baseline sql